⟵ Return to home page

CBG DashboardDemo CGD network

Live · AIS-140 4G 🕒
Dispatch day 06:00 – 05:59 · same layout as the VDAS production portal, with demo data
Current Day Dispatch
Predictive Next Day Dispatch
Loading Queue List FIFO 0
#Vehicle noEntry detailsCurrent barAction
Vehicle Approaching for Loading 0
SrVehicle noAllocated CBGCurrent locationDistanceArrival time
Loaded Vehicle Allocation 0
SrActionVehicle noAllocated ROCurrent locationDistanceReporting time
Vehicle Approaching for Unloading 0
SrActionVehicle noAllocated ROCurrent locationDistanceReporting time
Vehicle At RO 0
SrVehicle noRO nameBarEntry timeStayed (HH:MM)
Vehicle Performance
Unloading Location Performance
Loading Location Performance
Dispatch Statistics

Loading locations

CodeNameBaysFill rateFill targetMin. departure

Retail outlets (unloading locations)

CodeRO nameAvg. demandkm from Plant 1km from Plant 2Empty at

Vehicles

IDVehicle noDriverHome plantCascadeDevices

Terms used in VDAS

CascadeBank of CNG cylinders on the vehicle; ~650 kg usable between full and empty Dispatch day06:00 to 05:59 next day Predicted emptyTime the outlet cascade reaches the empty pressure, from live dispensing rate and hourly demand curve Safety marginPredicted empty minus vehicle ETA; negative = dry-out risk FIFO queueVehicles load in arrival order at each CBG plant Stayed (HH:MM)Time a vehicle has been parked at an RO; red above 6 h

Live retail outlet status dry-out at 45 bar · click a row for the AI decision

OutletCascade pressureDispensingPredicted emptyNext vehicleETASafety marginStatus

Today · live

AI decisions Explain →

Latest control-tower alerts All →

01MonitorLive cascade pressure from every outlet
02AnalyseDispensing rate & predicted empty time
03EvaluateEvery vehicle: distance, queue, fill time
04OptimiseScore: operations · safety · resources
05AllocateTrip issued to driver & outlet
06RepeatAt 75% fill, next trip planned
07ContinuousEvery 10 min, 24×7, no dispatcher

Decision explainer

#VehicleNowCascadeRoute kmETAMarginScore breakdownScore

How the score is calculated

predicted_empty = time until outlet pressure reaches 45 bar
  (integrates the hour-by-hour demand curve)
ETA = queue + remaining fill + travel (live traffic)
margin = predicted_empty − ETA

Operations = arrive just before empty (0–2 h margin best)
Safety = driver hours, night driving, safety score
Resources = shorter cycle, idle assets used first

Score = Wₒ·Ops + Wₛ·Safety + Wᵣ·Resources
Allocate when margin ≤ buffer (2.0 h)

Programme weightage live: changes the next decision

Operations
Safety
Resource optimisation

Default from the VDAS programme: Operations 40% · Safety 35% · Resource optimisation 25%.

Inputs → outputs

Cascade pressurePESO-approved transmitterVehicle locationAIS-140 certified 4G GPSDriver & roadAI dashcam, dual-facingOperations systemSCADA / SAP / Oracle (API) → OutputDynamic trip allocation→ OutputReplenish before depletion→ OutputMeasured utilisation→ OutputSafety & exception alerts

Fleet · live telematics click a vehicle

VehicleDriverStatusCascadeTripETAkm todayDrive hSafety

Vehicle

AI dashcam · road & driver facing

On-vehicle hardware (3D) drag to rotate · click a label

Click a numbered label to see what each device does.

Loading rules VDAS enforces

Minimum departure pressureExcessive stoppage at loadingFinal fill time & best outlet planned at75% fillReturn vehicle toloading station with shortest queue + travel
TimeCategoryAlertVehicle / siteDetailSeverityStatus

Alert catalogue · 25 types count today

Driver safety scoreboard

DriverVehicleScoreEvents

Same network, same demand, same events. Two simulations run side by side: one dispatched the traditional way (outlet phones at 80 bar, dispatcher sends the first loaded truck from its home station, the empty cascade is swapped as soon as the new truck arrives), and one by the VDAS AI. VDAS uses . Press ⏩ +24 h to see a full day instantly.

Head-to-head · since start

Outlet dry-out minutes

Gas dispatched per hour (kg) · VDAS

Export

Pressure & allocation rules

Control-tower alert limits

Fleet size restarts the simulation

Ten vehicles always sit at outlets as mobile storage (daughter-station model); the rest cycle between loading and outlets. Try reducing the VDAS fleet to see how far it can go without dry-outs.

LIVE DEMO

VDAS: Vehicle Dynamic Allocation System

You are in the 24×7 control tower of a demo CNG / CBG network: 2 CBG loading stations, 10 retail outlets and a fleet of cascade trucks. Nobody dispatches trucks by phone. VDAS reads outlet cascade pressure, GPS and loading queues, predicts when each outlet will run empty and sends the best vehicle at the right time.